PERI Press Release: Completion now within reach: flooding of a canal section Expansion of the Panama Canal
Expansion of the Panama Canal, Panama
Lascaux IV - Centre International d’Art Pariétal (CIAP): Overall view of the museum complex. Through the TRIO panel formwork, the high requirements on the concrete surfaces have been fully met.
Lascaux IV - Centre International d’Art Pariétal (CIAP) - overall view
Viaduct Krakow-Płaszow Railway Junction - Customized solution through the flexible and modular adaptability of the system.
Viaduct Krakow-Płaszow Railway Junction - flexible and modular adaptability of the system
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.
The PERI UP working scaffold Scaffold provides the solution for test preparations as well as continuous measurement and inspection work.
PERI press release - Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings
Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings
JKG Tower, Jalan Raja Laut, Kuala Lumpur - A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
JKG Tower - complete solution consisting of formwork, scaffolding and related services
Metro extension, Algiers - The Algerian metro station
Metro extension - 144 m long and 23 m wide
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
Pegasus Sculpture - more than 1,000 bronze castings could be assembled and welded on site
PERI press release - PERI India won the EPC World Media, Ernst & Young and Zee Business Group Award 2014 - Honoured for excellence in India Infrastructure and Construction Industry
PERI India won the EPC World Media, Ernst & Young and Zee Business Group Award 2014 - Honoured for excellence in India Infrastructure and Construction Industry
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust
Mur Bridge Frohnleiten - For the construction of the Mur Bridge near Frohnleiten, the new VARIOKIT heavy-duty truss from PERI has set new standards in shoring operations.
Mur Bridge Frohnleiten - VARIOKIT heavy-duty truss
Museum of Tomorrow, Rio de Janeiro - For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
Museum of Tomorrow - PERI planned, produced and delivered over 3,500 customised special formwork elements
The 3rd Bosphorus Bridge has the highest concrete bridge piers in the world, and will eventually connect the European and Asian continents after its completion in 2015.
3rd Bosphorus Bridge - has the highest concrete bridge piers in the world
PERI press release - Apps and Tools
PERI Apps make construction site operations easier - More digital solutions in formwork and scaffolding
UTEC University Campus, Lima, Peru - With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
UTEC University Campus - high architectural requirements and a tight construction schedule
Warsaw Spire - With a height of 220 m, the new office tower of the
Warsaw Spire - office tower with a height of 220 m
Capitol Hill Station, Seattle, USA - The VARIOKIT formwork carriage and HD 200 heavy-duty props were used for the construction of the new subway station in Seattle.
Capitol Hill Station - VARIOKIT formwork carriage ensured rapid concreting sequences
PERI press release - Family Business Career Day
Family Business Career Day at PERI
PERI press release - special formwork
Mercedes-Benz Museum in Stuttgart
Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.
Stanari Thermal Power Station - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser
Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
Munich Airport Satellite Terminal - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield
PERI press release - Seal of approval: Recognizing an ecological manufacturer - PEFC und FSC certifications for plywood
Seal of approval: Recognizing an ecological manufacturer - PEFC und FSC certifications for plywood
Certificate for the award as most innovative product in show
Award for myPERI - certificate
ISET Tower, Yekaterinburg, Russia - The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
ISET Tower - PERI planned a comprehensive, crane-independent concept
Dr. Fabian Kracht is the managing director for Finance and Organization at PERI GmbH.
Dr. Fabian Kracht
Marchlehner Gallery, Sölden, Austria - The VARIOKIT tunnel formwork solution accelerated construction of the 228 m long Marchlehner gallery situated at a height of 1,800 m above sea level. The competent planning process took into account al possible project requirements which ensured on-schedule completion before the onset of winter.
Marchlehner Gallery - at a height of 1,800 m above sea level with VARIOKIT
Midfield Terminal Building, Abu Dhabi - The Midfield Terminal Complex is the ultimate in construction sites.
Midfield Terminal Building - the ultimate in construction sites
Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
Smithland Hydroelectric Power Plant is equipped with 3 turbines
With PERI MAXIMO, the latest edition on panel formwork contains for the first time a system with one-sided tie technology – which has been proven to save up to 50 % on workload.
MAXIMO MX tie
Motorway bridge over the Drava, Osijek, Croatia - A VARIOKIT cantilevered parapet carriage serves for constructing the external cantilevered parapets.
Motorway bridge over the Drava - VARIOKIT cantilevered parapet
For the tenth time, Peri is offering all educational and training institutions involved in the field of construction the opportunity of participating in its well known Construction Exercise.
9th Construction Exercise group picture
Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
Eemshaven Power Plant - the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability
Hotel Mélia, La Défense, Paris, France - For the construction of the Hotel Meliá in the
Hotel Mélia, La Défense - PERI developed a comprehensive climbing formwork solution
Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.
Lanaye Lock Bridge - the concentrated loads are transferred into the available bridge piers
Nordhavnsvej Tunnel - The formwork carriage has been designed so that trucks can pass through at any time without obstacles. Due to the cramped site conditions, an absolutely essential requirement for the execution.
Nordhavnsvej Tunnel - formwork carriage has been designed so that trucks can pass through
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
North Station Vienna
PERI UP at the Skyscraper Festival
The Skyscraper Festival in Frankfurt - group picture
Grain Silo near Parma, Italy - Cost-effective PERI climbing concept: with a complete platform level and halved on-site wall formwork requirements, fast and continuous working operations were achieved.
Grain Silo near Parma - Cost-effective PERI climbing concept
PERI press release - Increased profitability for VARIOKIT tunnel formwork carriage - PERI civil engineering solutions at bauma 2013
VARIOKIT tunnel formwork carriage
Banco de la Ciudad de Buenos Aires - A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.
Banco de la Ciudad de Buenos Aires - standardized construction kit system
Evolution Tower, Moscow, Russia - Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
Evolution Tower - Inclined and crane-independently climbed RCS protection panel units
Hongkong-Zhuhai-Macao Bridge (HZMB), China - The 180 m long tunnel elements are cast in eight individual segments each 22.50 m long – monolithic, without ties and in compliance with strict dimensional tolerances.
Hongkong-Zhuhai-Macao Bridge - The 180 m long tunnel elements are cast in eight individual segments each 22.50 m long – monolithic, without ties and in compliance with strict dimensional tolerances.
PERI press release - PROKIT safety system
Construction-compliant accessories for the PROKIT safety system
The CaixaForum in Zaragoza resembles a sculpture and serves as a cultural meeting place.
CaixaForum, Zaragoza, Spain
Importer of the year 2014 - PERI Ukraine
Importer of the year 2014 - PERI Ukraine
Barangaroo South, Sydney - The three ITS high-rise towers for the centre of the ambitious Barangaroo South project in the Sydney harbour area.
Barangaroo South, Sydney - The three ITS high-rise towers
Overview of the construction site - PERI Project -
"Humboldt Forum" City Palace, Berlin
Leonhard Braig will be responsible for the areas of product management, product technology, development, procurement, production and logistics.
Leonhard Braig appointed Managing Director at PERI
Product Manager, Helmut Baechle (PERI Weissenhorn), Marketing Coordinator, Stéphanie Derouet, and the Manager of the Technical Office Thierry Chancibot (both PERI France) are highly delighted with the prize.
In France, the innovative DUO Lightweight Formwork was awarded the MAT D'OR.
PERI supported the construction project of the century with the planning and delivery of huge quantities of formwork and scaffolding systems.
Expansion of the Panama Canal, Panama
Lo Storto, The Twisted One, the future administrative building of the Generali Insurance Group
Lo Storto, The Twisted One, the future administrative building of the Generali Insurance Group
The parapet track is mounted to the bridge underside by means of rails and rollers. The bridge is freely accessible; traffic is unhindered.
Image 1: VARIOKIT Cantilevered Parapet Track VGB
Henninger Turm, Frankfurt am Main
Project-specific execution solutions
Continuous construction below: the parapet track is secured to the bridge underside by means of rails and rollers, and the bridge is freely accessible.
Image 1: The parapet track
The Konzil Building in Constance
The Konzil Building in Constance
PERI officially inaugurated its new site in Boom near the Belgian city of Antwerp in Belgium.
New business site for PERI Belgium
Three elevated high-rise structures for the new SPRM administrative centre. PERI supported the construction progress with an efficient climbing solution, complex shoring construction along with a comprehensive range of services.
SPRM Administration Building, Putrajaya, Malaysia
Your advantages in the use of CENTRIO CLM
CENTRIO CLM
Situated next to the famous Vienna Prater amusement park, seven distinctive and up to 33 m high residential towers are currently being realized.
33 m high residential towers
PERI recently received the prestigious
Internationally-recognized innovation prize for PERI
Professors from civil engineering faculties at universities in Germany and Austria came to Weissenhorn at the invitation of PERI, and were informed about the latest developments in the area of formwork and scaffolding systems during their two-day visit.
PERI symposium for university professors – group picture
The great interest in the 4th Lake Constance 5D Conference once again shows the great importance of the exciting topic.
Constance 5D Conference 2016
Combined with a heating element, MAXIMO also offers the right solution for concreting at low temperatures. The heat supply provides an uninterrupted hydration process – as shown here in winter in Finland.
MAXIMO with heating element
PERI GmbH Group Management Board: Dr. Fabian Kracht (Managing Director Finance and Organization), Alexander Schwörer (Managing Director Sales and Marketing) and Leonhard Braig (Managing Director Products and Technology).
PERI GmbH Group Management Board
With horizontally-positioned SB Brace Frame Units, generously-sized working levels were realized; in addition, they facilitated the load transfer of the cantilevered concreting sections above into the pylon shaft.
Project-specific formwork solution for a complex pylon structure
Big intake at BAU 2017: On the first two days already, PERI counted significantly more visitors than in 2015. The interested persons were particularly closely scrutinizing the PERI novelties.
PERI in Munich at the beginning of the year
Through the integrated scaffold nodes on the PERI UP Easy Frame, ledgers, supports and console brackets can be directly connected. This makes it possible, e.g., to also easily mount external flights of stairs; these provide convenient and safe access to all areas.
Flexible in every situation
The individual, pre-assembled formwork units are provided with a QR code which allows direct access to a wide range of data via one mouse click. Thus, drawings or assembly instructions are linked with the 3D model.
Directly access a wealth of data linked to the physical product via a tablet
The PERI DUO Universal Formwork is the winner of the “Best Innovation Product Award” category at the “Kostroi Angola 2016”.
„Best Innovation Product Award” for DUO in Angola
Neuschwanstein Castle is one of Germany's most famous sights. Every year around 1.5 million tourists from all over the world visit the cultural monument near Füssen.
Neuschwanstein Castle
Within the last year, the universal formwork system DUO has been tried and tested on several jobsites in the US and around the world to ensure it meets all contractors requirements.
PERI DUO
The realization of starter units which form the foundation for the tunnel-in-tunnel. This area is formed with custom steel formwork. The two support areas – one for the rising wall, another for the prefabricated panel which is mounted at the end of all reinforced concrete work and subsequently forms the bottom carriageway slab – are clearly visible.
The first working section in the tunnel tube
Up to 70,000 visitors flock daily to Australia's largest shopping centre which is now completely covered by a gigantic glass roof – the result of an expansion project. Work was carried out while the centre remained opened for daily business; the schedule for the entire construction project was extremely short.
Australia's largest shopping centre
Designed by Zaha Hadid, the new station – a construction consisting of concrete, glass and steel in the form of a bridge – is characterized by numerous curved shapes. Traffic flows from travelers inspired the architect to create this extraordinary shape.
“Porta del Sud” Railway Station, Naples Afragola, Italy
A total of seven buildings form the new Maakri Quarter in the heart of Tallinn: a very striking multi-storey structure over 100 m high while surrounding historical buildings are being extensively renovated.
Maakri Quarter in the heart of Tallinn
On two artificial islands at both exits of the HZMB tunnel, striking architectural concrete structures are currently being built. On the right of the picture, the exit at the west end of the tunnel can be seen. (Graphic: © China Communications Construction Company Ltd. CCCC)
Architectural concrete structures
PERI has provided the product catalogues for the MAXIMO and SKYDECK formwork systems for direct integration in Autodesk® Revit®. A major help for all designers who want to visualise the later concrete finish during the initial modelling, for example.
PERI Library+
The future highest high-rise building in Europe is currently being realized in Saint Petersburg: the headquarters of the energy company Gazprom will reach a total height of 462 m. Spectacular multi-functional buildings, an amphitheater and spacious parks complement the complex.
Lakhta Center, St. Petersburg
The innovative and tried-and-tested MAXIMO panel formwork has been adapted to accommodate the technology of single-sided anchoring and can be used very flexibly.
MAXIMO panel formwork
Demolition of the centrally located Syngenta high-rise building was hardly noticed in the immediate surroundings.
Demolition Syngenta High-Rise Building, Basel
Official opening of scaffold production in Günzburg / Bavaria
Official opening of scaffold production in Günzburg / Bavaria
When finished, the 77-storey high-rise building will have a total height of 324.50 m.
Four Seasons Hotel, Kuala Lumpur, Malaysia
The slab formwork carriages used are very modular in their design; the great flexibility of the VARIOKIT standard components facilitate simple adjustments to suit project-specific conditions. The relatively low weight of the VARIOKIT solutions is an additional benefit of the Engineering Construction Kit.
Marieholm Tunnel, Gothenburg, Sweden
The refurbished Williams Bridge is an important road link between the northern and southern districts of Rotterdam. Its unrestricted and safe use was also to be ensured during the scaffolding operations and renovation work.
Williams Bridge, Rotterdam, Netherlands
Dr. Rudolf Huber
Dr. Rudolf Huber
The winner of the 11th Construction Exercise: Maxim Rotzalski from RWTH Aachen.
Expert jury determines the winners of the 11th PERI student competition
Formwork, scaffolding, engineering: PERI supported site operations with a project-specific formwork and scaffolding concept.
Moselle Lock, Trier, Germany
Official groundbreaking ceremony for the next expansion phase of the PERI scaffolding plant in Guenzburg, Bavaria (f. l. t. r.): MDL Dr. Hans Reichart (Member of the federal state parliament), Dr. Fabian Kracht (Managing Director Finance and Organisation), Leonhard Braig (Managing Director Product and Technology), Dr. Rudolf Huber (Chief Executive Officer), Gerhard Jauernig (Lord Mayor Guenzburg), MDL Alfred Sauter (Member of the federal state parliament), Alexander Schwörer (Managing Director Sales), Stephan Finkel (Managing Director Plant Guenzburg).
Family business sets course for further growth
The new headquarters of the environmental company Bee'ah is currently being realized according to the plans of the famous architect Zaha Hadid. The design of the futuristic building with its complex structure is based on the shape of a sand dune. (Source: www.zaha-hadid.com)
Bee'ah Headquarters, Sharjah, United Arab Emirates
By combining CB Climbing Units with the MAXIMO Panel Formwork, the required high quality of the concrete surfaces was achieved while, at the same time, maintaining the tight construction schedule.
Hexagon Office Building, Calgary, Canada
For the first time in Berlin, the bautec.Innovation Award was presented in 2018 as part of a public award ceremony.
bautec.Innovation Award for PERI DUO
For the construction of the new terminal building in the port of Gazenica, the optimally coordinated PERI formwork and scaffolding solution facilitated fast and uninterrupted construction progress.
Terminal Building, Gazenica Passenger Port, Zadar, Croatia
Landing platforms consisting of standard system components served as temporary storage areas and for transferring loads to the following storeys. The platforms could be variably positioned anywhere on the building.
REDI Majakka Tower, Helsinki, Finland
The weather protection roof based on the PERI UP Flex LGS Lattice Girder System provided reliable protection against the effects of the weather. The roof segments could be pre-assembled on the ground and subsequently lifted into their final position using a mobile crane.
Circular Tank Refurbishment, Bitterfeld-Wolfen Chemical Park
In 2017, PERI founded the Digital Transformation Office in order to systematically promote digitalization. With the integration of the BIM Competence Center in this area, the company is taking account of the increasing strategic importance of this topic.
In focus: PERI bundles BIM activities
Constructing the asymmetric structure presented many challenges for the project’s concrete contractor, Baker Concrete, and formwork supplier, PERI USA.
National Veterans Memorial and Museum, Columbus, Ohio, USA
For the M-8 road bridge, PERI engineers planned a project-specific shoring and formwork solution. The heavy-duty scaffold construction, consisting of VRB Heavy-Duty Truss Girders and VST Heavy-Duty Towers, safely transferred the high loads via long spans into the ground.
M-8 road bridge, Szczecinek by-pass, Poland